The action was based on two violations. The first violation involved the failure to operate Unit 2 within steady state reactor core power level limit of 2436 (Mw) (thermal) and during power operation. The second violation involved the failure to maintain the calculated Average Planar Linear Heat Generation Rate (APLHGR) within the limits of Technical Specification 3.2.1. The violations were categorized as A Severity Level III problem.